I-77 is being built from left to
right near the Mecklenburg/Iredell County Line at the top of the photo.
A few roads have been recently truncated as a result of the building of
the man-made lake. At the bottom is US 21 which may have been routed
with NC 115 at the time. |
|
I-77 was in the process of being
built in Northern Mecklenburg County in 1965. The causeways that
carry I-77 over the lake are built; however, no pavement exists as it is
only graded for what will carry four lanes of traffic in the future. The
interchange that is shown is now Exit 30 Davidson. |
|
I-77 is being built at Exit 28 near
Cornelius. After construction was completed, I-77 would dump four
lanes of traffic onto a two lane US 21 just south of the interchange.
The next fifteen miles, to Interstate 85, would not see construction start
until the 1970s and completed by the middle of that decade. You can
see clearly where I-77 transitions into US 21. |
|
Notice something missing from this
aerial? It's I-77. This image is of Interstate 85 at the location
where I-77 now crosses. The Statesville Rd. (Exit 39) interchange
is at the bottom of the picture and Beatties Ford Rd (Exit 37) is at the
top. The school at the top is West Charlotte High. I-77 now
runs through where the lake is in the middle of the picture. |
|
You can see the construction end
at what will be the railroad overpass just south of Woodlawn (Exits 6A-B).
The road that is cut in half at the railroad tracks is Nations Ford Rd.
The section of road just above where the construction ends is now Nations
Ford Rd. The section below the construction was also named Nations
Ford Rd. until the 1990's when it was renamed Nations Crossing Rd.
The roads running across the bottom are South Blvd. and Old Pineville Rd.
The construction at the crossroads in bottom center (South Blvd & Woodlawn)
is for a Zayre's Department Store. There is a Media Play at the site
today. The road running along the railroad tracks to the left is
Wilmount Rd. Billy Graham Pkwy now runs through the woods between
Wilmount Rd and the railroad tracks. |
|
Construction at the Tyvola Road Interchange
(Exit 5). You can see in the picture that there is no construction
for Tyvola Rd. east of I-77 towards Old Pineville Rd. and South Blvd. which
are running across the bottom. The interchange was completely overhauled
from the original diamond interchange to a SPUI in the late 90s. |
|
The Nations Ford Rd. Interchange
(Exit 4) is towards the left. |
|
Clearing has been made in the vicinity
of Exit 3 (Arrowood Road). The crossroads at the bottom is the intersection
of Nations Ford & Arrowood Roads. |
|
Plenty of work still remains at what
will be the Westinghouse Blvd. (Exit 1) Interchange. |
|
Construction abruptly stops at the
state line in the middle of the photo. Carowinds would be in the
empty field above the construction. You can also see where the railroad
overpass is being constructed at the lower right. US 21 (now NC-SC
51) is at the left. |